Rigger Level 3 Aramco Notes Jun 2026
: Always use taglines to control load rotation and movement during a lift.
: Wear exceeding 10% of the original diameter or a lay length (the distance one strand takes to spiral the rope fully) that is distorted. rigger level 3 aramco notes
A Level 3 Rigger is the last line of defense. Before any lift, the following criteria must be checked: : Always use taglines to control load rotation
( T = (W / N) \times (L / H) )
For all lifts >75% of crane’s rated capacity, a formal Lift Plan (Form SA-001) and a third-party engineer’s review are required. 75% of crane’s rated capacity